Guide

    Manage your maps

    Start, edit and copy the mapping jobs you have set up

    Steps

    1. Open Map Config

      Pressing play starts a run straight away, and a run places real calls to the number. The tree button is greyed out until the job has run at least once.

    2. Edit a job

      Tags are lowercase letters, numbers and hyphens, up to ten per job.

    3. Change how it maps, then save

    4. Open a finished map

      The Map Results guide covers reading the tree, switching between runs and exporting it.